This is an author-deposited copy. The version of record was originally published elsewhere: Originally published in International Journal of Multidisciplinary Research and Growth Evaluation, Volume 3, Issue 6, 2022. DOI 10.54660/.IJMRGE.2022.3.6.1281-1303 . Original source: https://www.allmultidisciplinaryjournal.com/archives/year-2022.vol-3.issue-6.

Abstract

Flaring in onshore oil fields often stems from gathering, compression and vapor recovery systems sized without regard to how gas is lost. This study optimizes them for a representative twelve-pad field developed over three years. Weymouth gathering hydraulics with back-pressure effects on production are combined with daily simulation of compressor failures, midstream outages and vapor recovery downtime over ten years. The decision variables are trunk and lateral diameters, compressor count, vapor recovery configuration, vapor recovery towers, gas-to-power units and curtailment during outages. NSGA-II minimized flaring and venting intensity while maximizing net present value. Inputs are representative literature values, not field data. The legacy design captured 90.8 percent of gas at 10.1 kg CO2e per barrel of oil equivalent, with two thirds of flaring caused by gathering pressure limits. The maximum-value design added USD 108 million and cut intensity to 7.6 kg per barrel, but shifted flaring to compression shortfalls and tank vapor. The highest-value design meeting 98 percent capture cut intensity to 2.3 kg per barrel for USD 19 million less, about USD 103 per tonne of CO2e avoided. A seventh compressor and vapor recovery on high-volume pads achieved 95.7 percent capture for USD 2 million. Even a USD 200 per tonne carbon price did not make 98 percent capture optimal. Capture fell below 98 percent when midstream outages exceeded about five per year.

Keywords: gas flaringvapor recovery unitsgas gatheringmethane emissionsmulti-objective optimizationNSGA-IIonshore oil and gas

Full text

Text extracted from the article PDF for reading and search. Tables, figures and equations are in the PDF, which remains the authoritative version.

1. Introduction

Gas flaring remains one of the most visible and avoidable sources of greenhouse gas emissions from oil production. Satellite surveys using the Visible Infrared Imaging Radiometer Suite (VIIRS) estimated that about 143 billion cubic metres of associated gas were flared worldwide in 2012 [1], and analyses of global flaring have estimated its contribution to emissions and the potential role of flaring reduction in meeting mitigation targets [2–4]. In the United States, flaring rose sharply with tight oil development: flaring in North Dakota more than doubled between 2011 and 2013 [5], and flaring in the Permian and Bakken basins has been linked to pipeline takeaway constraints that depressed regional gas prices [6, 7]. Flares do not destroy all the methane they receive. Aerial measurements in the Permian, Eagle Ford and Bakken basins found that inefficient and unlit flares make flaring a larger methane source than inventories assume [8], and earlier studies measured methane destruction efficiencies and black carbon emissions from flares associated with shale production [9–11]. Flaring and venting at onshore facilities have several engineering causes. Gas gathering systems built for early production can become pressure-limited as new pads come online, so that gas must be flared at the pad [6, 12]. Compressor failures and midstream outages force gas to the flare at central facilities [13, 14]. Storage tanks emit flash gas, working and breathing losses that must be captured by vapor recovery units (VRUs) or routed to combustors, and aerial surveys have identified tanks as frequent sources of large emissions [15, 16]. Regulators have responded. North Dakota set gas capture targets under Industrial Commission Order 24665 [17], the New Mexico Oil Conservation Division adopted natural gas waste reduction rules in 2021 that raise the required gas capture rate to 98 percent [18], and the Environmental Protection Agency has applied performance standards to new oil and gas sources since 2016 [19]. The World Bank Zero Routine Flaring initiative, launched in 2015, provides a global industry commitment [20].

Engineering studies have addressed parts of this problem. Flare gas recovery and utilization options, including gas-to-power, gas-to-liquids, natural gas liquids recovery and reinjection, have been evaluated techno-economically [21–23]. VRU installation has been documented by the Natural Gas STAR programme [24, 25]. Gas pipeline network design and operation have been optimized with mixed-integer nonlinear programming [26, 27], and production systems have been optimized for gas-lift allocation and well scheduling [28, 29]. These studies rarely consider gathering design, compression redundancy, vapor recovery and operating policy together, under the uncertainty of equipment failures and midstream outages, and with flaring intensity and value as joint objectives. Regulatory capture targets raise a further question: what does it cost to meet a 98 percent capture requirement, and which combination of measures meets it most efficiently [18, 30]?

This paper addresses these questions with a simulation-optimization study of a representative onshore field. It makes four contributions. First, it couples Weymouth gathering hydraulics with back-pressure effects on production, daily stochastic simulation of compressor, VRU and midstream availability, and tank vapor handling in a single model [13, 24, 31]. Second, it applies the non-dominated sorting genetic algorithm II (NSGA-II) to ten design and operating variables and traces the trade-off between flaring and venting intensity and net present value [32, 33]. Third, it decomposes flaring by cause for representative designs, showing how optimization shifts the causes of flaring. Fourth, it evaluates the cost of meeting a 98 percent capture requirement, the effect of carbon prices and the sensitivity of compliance to midstream reliability. Section 2 reviews the literature, Section 3 describes the model, Section 4 presents results, Section 5 discusses implications and Section 6 concludes.

2. Literature Review

This section reviews the literature on the scale and measurement of flaring, flare emissions and their impacts, flaring regulation, flare gas recovery and utilization, methane emissions from production sites, vapor recovery, leak detection and mitigation costs, gas network optimization and production system optimization. The review draws on overviews that describe flaring as an engineering, economic and regulatory problem [3, 4, 34] and on the observation that flaring persists because the value of the recovered gas is often lower than the cost of the infrastructure needed to capture it [35–37]. It also reflects regulatory reviews of flaring and venting data and policy in the United States [19, 38].

2.1. Scale and Measurement of Flaring

Satellite remote sensing has transformed the measurement of flaring. VIIRS Nightfire satellite pyrometry [39] and methods for a global survey of flaring [1] built on a fifteen-year record derived from earlier sensors [40], and detection limits have been extended with short-wavelength channels [41]. The Along Track Scanning Radiometer series and successors have monitored flaring [42–44], the Sea and Land Surface Temperature Radiometer has detected persistent hot spots [45], and MODIS and VIIRS fire products have been compared [46]. Landsat-based and other methods estimate flaring at individual stations [47, 48], the RST-FLARE algorithm has characterized flaring at the Val d’Agri oil centre [49–51], VIIRS has been used to identify industrial heat sources [52], quantify methane consumed in Bakken flares [53] and learn from nighttime observations in North Dakota [7], and satellite data have linked changes in Mexico’s offshore flaring to regulation [54]. Differences between the MODIS and VIIRS fire products in Khanty-Mansiysk [46] and the detection limits that still apply to small flares [41] show the remaining uncertainty.

2.2. Flare Emissions and Impacts

Flare performance depends on design, gas composition and wind. Parametric models of flare efficiency in crosswinds [55, 56], theoretical and observational assessments [57], computational fluid dynamics of wind-tunnel experiments [58], numerical simulation of ethylene flares [59], the Texas Commission on Environmental Quality flare study [60], and direct measurement of volatile organic compound destruction [61] establish that combustion efficiency can fall well below design values. Methane destruction efficiencies have been measured for shale flares [9], and inefficient and unlit flares emit large quantities of methane [8]. Black carbon from flaring is significant regionally and globally [62–66], including in the Bakken [10, 67], the United States [68], Russia [69] and West Africa [70], and nitrogen oxides from oil and gas regions have increased [71]. Carbon dioxide, methane and black carbon emissions from upstream flares have been quantified [11]. Flaring has been associated with air pollution hotspots and health risks [72–76], adverse birth outcomes [77], exposure of nearby populations [78], paediatric asthma [79], disproportionate exposure of minority communities in South Texas [80] and changes in emissions in Nigeria [81, 82]. The usefulness of flares for air pollution control has been reviewed [83].

2.3. Regulation and Policy

Flaring regulation varies by jurisdiction. North Dakota’s gas capture policy set targets that rose over time [17], New Mexico adopted a 98 percent capture requirement in 2021 [18] and federal performance standards for new sources were introduced in 2016 [19]. Reporting obligations add a further layer: greenhouse gas disclosure and ESG compliance requirements now shape how energy and infrastructure enterprises account for flared and vented volumes [84], and regulatory reform of statutory bidding workflows in emerging energy markets affects how quickly gas utilization projects can be procured [85]. Analyses of state regulation of unconventional development [86], policy options for tight oil fields [35], federal and state regulatory overviews [19], data improvement [38], regulation of gas-to-wire offshore [87], flaring reduction in Brazil [88], stimulation of associated gas use [89], domestic market development to eliminate routine flaring [90] and the Zero Routine Flaring initiative [20] provide context. Pipeline constraints that depress regional prices create incentives to flare [6], and the Bakken experience shows how rapid development outpaces gathering infrastructure [5, 91].

2.4. Flare Gas Recovery and Utilization

Flare gas recovery has been studied extensively in refineries and gas plants [92–97], olefin plants [98, 99], Egyptian and other oil and gas operations [100, 101], giant gas refineries [95] and the natural gas processing industry [12], and recovery technologies have been reviewed for their contribution to energy security, environmental performance and resource efficiency [23]. Techno-economic feasibility [36, 102, 103], multi-objective decision models [104], process optimization [105], separator optimization [101], crude stabilization through multi-stage separation [106], plantwide dynamic simulation for flare minimization [107], ejector systems [108], exergoeconomic analyses [109, 110], power generation [111, 112], organic Rankine cycles [113], solid oxide fuel cells [114], hydrogen production [115, 116], algal protein [117] and liquefied natural gas or compressed natural gas production [118] have been examined. Gas-to-liquids routes have been reviewed [119, 120] and simulated [121–125], natural gas liquids recovery has been evaluated [126, 127], gas-to-wire projects have been reviewed [128], liquefaction has been assessed [129], and comparisons of GTL and LNG [130] and other gas monetization options [131] inform decisions. Reviews of utilization options [21, 22, 132], small-scale utilization [133, 134], abatement costs in Brazil [37] and industry innovation [135] show that small, remote and declining volumes are the hardest to monetize, which is the situation of many onshore tight oil pads. Gas processing fundamentals are covered in standard texts [136].

2.5. Methane Emissions from Production Sites

Measurement campaigns have shown that methane emissions from the United States oil and gas supply chain exceed inventory estimates [137–140] and follow heavy-tailed distributions dominated by super-emitters [141–144]. Ground-level measurements have been synthesized [145], divergent estimates reconciled [146], and production sites studied with mobile flux plane [147], mobile measurements [148, 149] and direct component measurements [150–152]. Well pad emissions vary across basins [153–155], including marginal and low-production wells [156, 157], abandoned wells [158–161], gathering and processing facilities [162, 163], compressor stations [164, 165], pneumatic controllers [166], liquid unloading [167] and storage tanks [15, 16, 168]. Basin studies cover the Barnett [169–174], Denver-Julesburg [175, 176], Four Corners [177–179], Haynesville, Fayetteville and Marcellus [180–182], Uintah [183, 184], central and western United States [185], the Bakken [186, 187], Alberta [188, 189] and California [190, 191]. Permian studies have quantified emissions with satellites [192, 193], aircraft [194, 195] and well pad measurements [196], and observed variation with oil price during the COVID-19 pandemic [197]. Aerial surveys [15, 198– 203], unmanned aerial vehicle monitoring of pipelines and corridors [204], satellite observations [205–211], controlled release tests [212–215], mass balance methods [216] and the Aliso Canyon blowout [217] demonstrate the range of methods. Temporal variability [218–220], inventory gaps [221–224], the greenhouse gas footprint of shale gas [225], oil and gas emissions and air quality [226], supply chain emissions [227], the global methane budget [228], sampler malfunctions [229, 230], global ultra-emitters [208] and abatement benefits [231] complete the picture.

2.6. Vapor Recovery and Tank Emissions

Vapor recovery has a long history in oil production. Early applications [232], practical design approaches [233], field use in the Austin Chalk [234], vapor jet systems [235], the American Petroleum Institute tank vapors project [236], heavy oil tank emissions [237] and methods for estimating methane from crude oil stock tanks [168] established the engineering basis. The Natural Gas STAR programme documented VRU installation, costs and payback [24, 25]. Recent aerial surveys show that tanks are frequent sources of large emissions, often because of open thief hatches or malfunctioning control systems [15, 16, 142], which implies that VRU availability and tank control effectiveness matter as much as installation.

2.7. Leak Detection, Repair and Mitigation Costs

Leak detection and repair (LDAR) technologies have been reviewed [238] and compared by single-blind tests [239], and the effectiveness of optical gas imaging [240, 241], mobile surveillance [242], aerially guided LDAR [243], repeated surveys [244], virtual field simulation [245], agent-based equivalence modelling [246] and the cost-effectiveness of new technologies [247] have been studied. Policy design for distributed small sources [248], rapid deployment of mitigation [249], mitigation potential from reported venting and flaring [30] and assessments of methane abatement from oil and gas [250] indicate that many measures have low or negative net cost. Data-driven frameworks for controlling occupational safety risk in large energy infrastructure projects [251] show that the same field surveys can serve safety as well as emission objectives. These studies treat mitigation measures one at a time, whereas the cost of meeting a capture target depends on how measures interact in a specific system.

2.8. Gas Network and Gathering System Optimization

Optimization of natural gas networks has a long history. Reviews of optimization problems in gas transportation [26], design and operation of transmission networks [27, 252], strategic planning [253], expansion planning with convex relaxations [254–256], variable-speed compressor optimization [257], transient optimization [258, 259], network reduction techniques [260], mixed-integer programming for gas purchase and transportation [261], the gas transmission problem [262], gas allocation [263], pooling problems [264–266], linepack planning under uncertainty [267], stochastic flow simulation [268], unsteady operation [269], risk loss costs [270], large-scale operation optimization [271], linearization for distribution [272], nonuniform elevation [273], power minimization in gunbarrel networks [274, 275], security regions [276], refinery fuel gas networks [277], compressor operation for flexibility [278], Norwegian production and transport [279], booking feasibility [280], transient simulation [281, 282] and multi-period infrastructure planning [283] have been reported. Pipe sizing for tree-shaped networks [284–287], convex reformulations and pruning for network design [288–290], capacity expansion [291], offshore pipeline system design [292], network layout [293], minimum-cost network design heuristics [294], operations research for pipeline planning [295], cost functions [296] and the dependence of mature-field production on gathering hydraulic resistance [297] are directly relevant to gathering design. Supply reliability of gas networks has been assessed by Monte Carlo and other methods [13, 298–300], and compressor standby schemes have been optimized for reliability [14, 301], and risk-based process engineering has been proposed as a framework for strengthening reliability across complex natural gas infrastructure [302]. Shale gas infrastructure studies address modular and distributed facilities [303, 304], mobile plants to monetize associated gas [305, 306], investment and profitability [307–309], scheduling [310], water-energy nexus optimization under uncertainty [311–315]. Multi-objective optimization with NSGA-II has been applied to combined gas and electricity network expansion planning [32], genetic algorithms have been applied to gas lift allocation [33], and network expansion and uncertainty in coupled networks have been analysed [316, 317]. The standard reference on gas pipeline hydraulics provides the Weymouth and Panhandle equations used in gathering design [31].

2.9. Production System Optimization

Production system optimization connects wells, networks and facilities. Gas-lift allocation has been optimized by dynamic programming [318, 319], mixed-integer linear optimization [28, 320], piecewise-linear models [321], nonlinear programming [322], genetic algorithms [33, 323], global optimization [324, 325] and improved allocation procedures [326– 328], supported by models of gas-lift performance [329, 330]. Compressor design and scheduling in gas-lifted fields [331], load sharing for gas compressors [332], well scheduling [29], short-term production optimization of offshore platforms [333, 334], pumpoff scheduling under power constraints [335], goal programming for mature field production [336], well management in reservoir simulation [337] and mathematical techniques for production system optimization [338] illustrate the field. Liquid loading in gas wells [339], compressor application to extend the production life of mature fields [340], artificial lift and multiphase flow [341], nodal analysis of production systems [342] and optimization methods [343] provide the engineering foundations. These studies show that back-pressure at the wellhead affects production, which links gathering design to production value.

2.10. Research Gap

The literature offers mature methods for measuring flaring and methane, recovering flare gas, optimizing gas networks and allocating production, but three gaps remain for onshore tight oil facilities. First, gathering design, compression redundancy, vapor recovery and outage operating policy are rarely optimized together, although each addresses a different cause of flaring [13, 24, 26]. Second, stochastic availability of compressors, VRUs and midstream outlets is seldom represented in design optimization, although it determines upset flaring [8, 13, 14]. Third, the cost of meeting regulatory capture targets such as New Mexico’s 98 percent requirement has not been quantified as a trade-off against value [18, 30, 250]. The model described next addresses these gaps.

3. Methods

This section describes the representative field, the gathering hydraulics and production model, the stochastic simulation of compression, midstream and vapor recovery availability, the emission and economic calculations, and the multi-objective optimization. The model combines elements that are standard individually: Weymouth flow for gathering lines [31, 136], back-pressure effects on well deliverability [341, 342], Monte Carlo availability simulation of the kind used in gas supply reliability studies [13, 299, 300], and NSGA-II for multi-objective search [32]. Two-state failure and repair models of this kind are standard in reliability engineering and failure analysis of complex engineering systems [344]. All parameter values are representative values chosen from ranges reported in the literature cited; they are not data from a specific field, and the results demonstrate the method and the relative performance of designs rather than estimate outcomes for any operator.

3.1. Representative Field

The field comprises twelve well pads connected by three laterals of 3 miles each to an 8-mile trunk line that delivers gas to a central facility, where reciprocating compressors raise it to the pressure of a midstream outlet (Figure 1). Four pads come online at the start, four after one year and four after two years, representing staged development of a tight oil field [5, 91]. Initial gas rates range from 1.8 to 8.1 MMscf/d per pad, six pads being high-volume pads with initial rates of at least

5.4 MMscf/d, and rates decline hyperbolically

with initial decline �??????=0.65 per year and ??????=1.1, typical of tight oil wells [307, 308]. The unconstrained field gas rate peaks at about 38 MMscf/d when the third group of pads comes online. Oil production follows from a producing gas-oil ratio of 1.6 Mscf per barrel. Each pad has a separator, storage tanks and a combustor, and may have a VRU and a vapor recovery tower (VRT). The midstream outlet accepts up to 32 MMscf/d and experiences outages at an average of five per year with an exponentially distributed mean duration of 1.5 days, representing the takeaway and processing interruptions that cause upset flaring [6, 12].

Fig 1: Representative field layout: twelve pads on three laterals, trunk line, central compression, gas-to-power units, central flare and midstream outlet.

3.2. Gathering Hydraulics and Production

Flow in Each Lateral and the Trunk Is Described by the Weymouth Equation [31, 136]:

with ??????=0.0008 per psi and �base=120 psia. Flows and pressures are solved by fixed-point iteration. If a pad pressure would exceed the separator limit of 265 psia, the flow on that lateral is reduced by bisection until the limit is met, and the excess gas is flared at the pads; this represents gathering-constrained flaring [12, 297].

3.3. Stochastic Availability and Daily Gas Balance

Each day � of the ten-year horizon is simulated in 200 replications. Compressor units of 5 MMscf/d each follow a two-state Markov process with a daily failure probability of 1/42 and a mean repair time of 2 days, giving an availability of about 0.955, consistent with reliability data for reciprocating compression [14, 301]. The repair time assumes that spares are held on site, as in models of inventory availability and plant uptime [345] and of materials readiness for maintenance-driven supply chains [346]. Midstream outages occur as a Poisson process. VRU units have an availability of 0.90, reflecting the downtime reported for vapor recovery [24, 25]; a dual VRU is available when either unit is available. Tank vapor of 45 scf per barrel of oil is generated at each pad [168, 236]. A fraction escapes uncontrolled through thief hatches and pressure relief valves, set at 8 percent without a VRT and 2 percent with one, reflecting aerial evidence of tank control failures [15, 16]. The remainder is recovered by the VRU when it is available, or otherwise routed to the combustor. The gas reaching the central facility on day � is the gathered gas plus recovered tank vapor, ��, and the daily balance is ��=min{��−��, 5 ??????�, ��},  ���=��− ��−�� (4)

3.4. Emissions, Capture and Economics

Gas Capture Is the Share of Produced Gas, Including Tank Vapor, That Is Sold or Used:

Emissions combine carbon dioxide from combustion, methane slip from flares and combustors at a destruction efficiency of 95 percent, below design values but consistent with field measurements [8, 9, 60], and vented tank vapor:

where � and � are the volumes flared and vented, �CO2= 0.060 t CO2 per Mscf burned, ??????CH4=0.72 and ??????CH4,�= 0.45 are the methane fractions of field gas and tank vapor, ??????=0.95 is the destruction efficiency, ??????CH4=0.0192 t per Mscf and GWP=29.8 is the 100-year global warming potential of fossil methane. Flaring and venting intensity is �CO2e divided by production in barrels of oil equivalent (boe), with 6 Mscf of gas per boe. Net present value at 10 percent combines oil margin (USD 40 per barrel), gas sales (USD 2.5 per Mscf), electricity from gas-to-power displacing purchased power at USD 0.06 per kWh up to a field load of about 4 MW, capital costs and operating costs (Table 1) [30, 296]. Installed equipment costs depend on procurement strategy, and the values in Table 1 assume competitively procured standard packages [347].

Table 1: Principal cost and economic parameters. Item Value Gathering pipe installed cost USD 0.15 million per inch-mile Compressor unit (5 MMscf/d), capital and annual operating cost USD 1.6 million; USD 0.12 million per year Vapor recovery unit, capital and annual operating cost USD 0.25 million; USD 0.03 million per year Vapor recovery tower USD 0.15 million Gas-to-power unit (0.5 MMscf/d), capital and annual operating cost USD 2.2 million; USD 0.15 million per year Oil net margin; gas price; displaced electricity price USD 40 per barrel; USD 2.5 per Mscf; USD 0.06 per kWh Share of curtailed oil value lost 30 percent Discount rate; horizon 10 percent; 10 years

3.5. Multi-Objective Optimization

where ??????‾ and NPV are the mean flaring and venting intensity and mean net present value over 30 replications with common random numbers. NSGA-II [32] was run with a population of 80 for 70 generations, using simulated binary crossover and polynomial mutation with integer rounding. The resulting non-dominated designs were re-evaluated with 200 independent replications. Four designs were selected for detailed comparison: the legacy baseline (D0), the maximum-NPV design (D1), the highest-NPV design whose mean capture meets the 98 percent requirement adopted in New Mexico (D2) [18] and the minimum-intensity design (D3). The selection of designs under carbon prices from USD 0 to 200 per tonne used the discounted CO2e emissions. Sensitivity analyses varied midstream outage frequency, VRU availability and midstream capacity.

Table 2: Decision variables and their ranges. Variable Options Baseline D0 Trunk diameter 6, 8, 10, 12, 14, 16 in 10 in Diameter of each of three laterals 6, 8, 10, 12, 14, 16 in 6 in Number of compressor units 4 to 10 6 VRU configuration, high-volume pads None, single, dual Single VRU configuration, other pads None, single, dual None Vapor recovery tower at high-volume pads No, yes No Gas-to-power units 0, 1, 2 0 Outage policy Flare through, curtail Flare through

4. Results

This section reports the Pareto front, the comparison of selected designs and the causes of flaring, the time profile of flaring, the effect of carbon prices and the sensitivity of the results to midstream reliability, VRU availability and midstream capacity. Because the inputs are representative, the relative performance of designs and the structure of the trade-offs are more informative than absolute values, as in other techno-economic optimization studies of flare reduction and gas networks [32, 104, 110]. All results are means over 200 independent replications that were not used in the optimization, so that the reported performance is not biased by the random numbers on which the search was conducted.

4.1. Pareto Front

Figure 2 shows the 80 non-dominated designs found by NSGA-II, re-evaluated with 200 replications. Every design dominates the legacy baseline, which has an intensity of 10.1 kg CO2e per boe and an NPV of USD 1,013.6 million. Along the front, intensity ranges from 2.0 to 7.6 kg CO2e per boe and NPV from USD 1,079.5 to 1,121.9 million. The front is flat at high intensity: moving from 7.6 to about 4 kg per boe costs less than USD 6 million. It becomes steep below about 2.5 kg per boe, where further reductions require curtailment during outages, dual VRUs on all pads and additional compression. Designs that curtail production during outages occupy the low-intensity end of the front, and designs that flare through outages occupy the high-value end. All non-dominated designs use two gas-to-power units, whose displaced electricity is worth more than the gas sold at the assumed price, a finding consistent with techno-economic studies of power generation from flare gas [111, 112].

Fig 2: Non-dominated designs for flaring and venting intensity and net present value, with the baseline (D0), maximum-NPV (D1), highest-NPV design meeting 98 percent capture (D2) and minimum-intensity (D3) designs.

4.2. Selected Designs and Causes of Flaring

Table 3 compares the selected designs and Figure 3 decomposes flaring by cause. The baseline captured 90.8 percent of gas. Its 6-inch laterals could not carry the peak production after the second and third groups of pads came online, pad pressures reached 405 psia, and 3.37 Bcf of the

5.20 Bcf flared over ten years, about two thirds, was flared at

pads because of the gathering pressure limit. High back-pressure also reduced well deliverability by up to 23 percent. Midstream outages caused a further 1.30 Bcf of flaring and tank vapor routed to combustors 0.50 Bcf.

Table 3: Comparison of selected designs over the ten-year horizon (mean of 200 replications). Measure D0 Baseline D1 Maximum NPV D2 Highest NPV with 98 percent capture D3 Minimum intensity Trunk and lateral diameters (in) 10; 6, 6, 6 16; 10, 10, 12 14; 10, 12, 8 12; 10, 8, 8 Compressor units 6 6 8 10 VRU high-volume pads; other pads Single; none None; none Dual; single Dual; dual Vapor recovery towers; gas-to-power units No; 0 No; 2 Yes; 2 Yes; 2 Outage policy Flare through Flare through Curtail Curtail Capital cost (USD M) 31.2 47.6 52.9 53.4 Gas capture (percent) 90.8 93.2 98.0 98.3 10th percentile of capture (percent) 90.3 92.7 97.8 98.1 Intensity (kg CO2e per boe) 10.1 7.6 2.3 2.0 Emissions (kt CO2e) 452 372 110 93 Gas flared (Bcf) 5.20 4.17 1.17 0.96 Gas vented (Bcf) 0.13 0.14 0.06 0.06 Oil produced (million bbl) 35.3 38.6 37.9 37.3 NPV (USD M) 1,013.6 1,121.9 1,102.7 1,079.5 The maximum-NPV design D1 removed the gathering constraint with a 16-inch trunk and 10- and 12-inch laterals, which lowered peak pad pressure to 132 psia, raised oil production by 3.3 million barrels and added USD 108 million of NPV. It reduced intensity to 7.6 kg per boe, but it did not eliminate flaring; it shifted its causes. With six compressors handling a larger gas stream, compression shortfalls caused

1.17 Bcf of flaring, and without VRUs tank vapor routed to

combustors rose to 1.60 Bcf. Midstream outages caused 1.40 Bcf. This shift illustrates that debottlenecking gathering without matching compression and vapor recovery moves flaring downstream rather than removing it [12, 14]. Design D2, the highest-NPV design meeting 98 percent capture, combined a 14-inch trunk with eight compressors, dual VRUs on high-volume pads, single VRUs elsewhere, VRTs and curtailment during outages. It reduced flaring to 1.17 Bcf, of which 0.80 Bcf arose on the first day of midstream outages before curtailment took effect and 0.32 Bcf from compression shortfalls, and reduced intensity to 2.3 kg per boe, 77 percent below the baseline and 70 percent below D1. Its NPV was USD 19.3 million below D1, and its discounted emissions were 188 kt CO2e lower, an implied abatement cost of about USD 103 per tonne. The minimum-intensity design D3 achieved 2.0 kg per boe and 98.3 percent capture with ten compressors and dual VRUs on all pads, but at a further USD 23.2 million for 14 kt of discounted emissions, more than USD 1,600 per tonne.

Fig 3: Gas flared or vented over ten years by cause for the selected designs.

4.3. Time Profile of Flaring

Figure 4 shows the monthly share of gas flared or vented. The baseline flared 25 percent of gas in the first month, 25 percent when the second group of pads came online and 44 percent when the third group came online, because each new group of pads pushed the gathering system past its pressure limit; flaring then declined as production fell and settled at about 3 percent, driven by midstream outages and tank vapor. D1 flared up to 26 percent when the third group came online, because compression rather than gathering became the bottleneck, and settled at about 5 percent, higher than the baseline in later years because it had no VRUs. D2 and D3 kept the flared share near 1 to 2 percent except for a short peak of 14 and 10 percent when the third group came online. The profile shows that the timing of development relative to infrastructure capacity is a major driver of flaring, as in the Bakken [5, 91].

Fig 4: Monthly share of produced gas flared or vented for the selected designs.

4.4. Carbon Prices

Table 4 shows the design that maximizes NPV less the cost of discounted emissions at carbon prices from USD 0 to 200 per tonne. A price of USD 25 per tonne was sufficient to add a seventh compressor and single VRUs on high-volume pads, which raised capture from 93.2 to 95.7 percent and cut emissions by a third for a loss of USD 2.2 million in NPV, an abatement cost of about USD 24 per tonne of discounted emissions. VRTs entered at USD 75 per tonne and curtailment during outages at USD 100 per tonne. Even at USD 150 to 200 per tonne, the optimal design captured 97.3 percent of gas, below the 98 percent requirement, because the last increments of capture require curtailment and redundancy whose cost per tonne is very high. This pattern of rising marginal cost matches analyses of methane abatement costs in the industry [30, 250].

Table 4: Design maximizing NPV net of carbon cost at different carbon prices. Carbon price (USD per t CO2e) Main changes from D1 Capture (percent)

Intensity (kg CO2e per boe)

NPV before carbon cost (USD M)

4.5. Sensitivity

Figure 5 and Table 5 show the sensitivity of capture to midstream reliability, VRU availability and midstream capacity, each evaluated with 100 independent replications, so base-case values differ slightly from Table 3. Midstream outage frequency had the largest effect. With two outages per year, D2 captured 98.8 percent; with ten, its capture fell to 96.8 percent and its intensity rose to 3.6 kg per boe. D1 fell from 94.5 to 91.0 percent over the same range. Reducing midstream capacity from 32 to 28 MMscf/d reduced D2 capture to 96.9 percent, and raising it to 40 MMscf/d raised capture to 98.5 percent. VRU availability between 0.80 and 0.97 changed D2 capture by less than 0.2 percentage points, because dual units on high-volume pads already provide redundancy. Compliance with a 98 percent capture requirement therefore depends on midstream reliability and capacity, which are outside the operator’s facility design [6, 13].

5. Discussion

This section interprets the results in relation to the literature, draws implications for operators and regulators, considers how the approach can be applied to real fields and sets out the limitations of the study. The discussion is framed by the evidence that flaring and venting at onshore facilities arise from a combination of infrastructure constraints, equipment unavailability and tank control failures [8, 12, 15], and by marginal abatement cost analyses showing that the cost of reducing emissions varies widely between measures [30, 247, 250]. It focuses on what the interaction between gathering, compression, vapor recovery and outage policy implies for engineering practice and regulation.

5.1. Principal Findings

Three findings stand out. First, the dominant cause of flaring in the legacy design was not midstream outages or tank vapor but gathering capacity: undersized laterals could not carry peak production from staged pad development, so gas was flared at the pads and back-pressure also reduced production. Debottlenecking gathering was both the most valuable and a substantial emission-reducing measure, which reinforces evidence from the Bakken and Permian that flaring rises when development outpaces gathering and takeaway infrastructure [5, 6, 91] and the dependence of mature-field production on gathering hydraulic resistance [297]. Second, debottlenecking alone shifted flaring to compression and tank vapor rather than removing it, so the most valuable design flared 4.2 Bcf over ten years and captured only 93 percent of gas. Effective flare reduction requires that gathering, compression, vapor recovery and outage policy be designed together, a conclusion that single-measure studies of flare gas recovery and mitigation cannot reach [21, 22, 247]. Third, the cost of capture rises steeply near regulatory targets. The first increments, a seventh compressor and VRUs on high-volume pads, cost about USD 24 per tonne of CO2e avoided, consistent with the low or negative costs reported for many methane mitigation measures [30, 247, 250]. Meeting 98 percent capture cost about USD 103 per tonne relative to the maximum-value design, and pushing beyond it more than USD 1,600 per tonne. Even a carbon price of USD 200 per tonne did not make 98 percent capture optimal in the model, which implies that a 98 percent requirement such as New Mexico’s is a binding constraint that goes beyond what plausible carbon prices alone would achieve [18, 231].

5.2. Implications for Operators and Regulators

For operators, the results suggest four practical priorities. The first is to size gathering for the peak of staged development rather than for initial pads, because gathering-constrained flaring and back-pressure losses are expensive in both value and emissions [284, 293]. The second is to provide compression redundancy matched to the gathered volume, an N+1 or N+2 arrangement, in line with reliability-based standby optimization for gas pipelines [14, 301], and to support it with predictive maintenance and condition monitoring of the compressor fleet [348]. The third is to install VRUs at high-volume pads, preferably with redundancy and VRTs, and to maintain tank controls, because aerial surveys show that tank emissions often arise from control failures rather than design [15, 16, 24]; thief hatch and pressure relief inspections belong in the same maintenance routines that prevent incidents in industrial maintenance [349], and non-intrusive inspection of separators and pressure vessels can shorten the shutdowns that take VRUs out of service [350]. The fourth is to plan for midstream outages through curtailment protocols and on-site gas use, since outages caused the largest residual flaring in the compliant designs [6, 111, 128]. Curtailment protocols must balance production against compliance, a balance that integrity frameworks for high-risk upstream operations address explicitly [351]. Gas sales and gathering agreements can also allocate outage risk: supply chain resilience frameworks for gas processing plants [352], force majeure provisions in energy supply contracts [353] and liability mitigation in high-value energy service contracts [354] bear directly on who carries the cost of flaring when the midstream outlet is unavailable, and supply chain risk management for gas processing projects affects when new compression and gathering capacity arrives [355].

For regulators, the results show that capture compliance depends on midstream reliability and capacity, which individual operators do not control. With ten outages per year, even the minimum-intensity design fell below 98 percent capture. Capture rules may therefore need to be accompanied by attention to midstream reliability and to the treatment of upset events, as in the North Dakota and New Mexico frameworks [17–19]. Satellite and aerial monitoring can verify flaring and venting performance independently of operator reporting [1, 194, 205], and comparisons of measured emissions with inventories can check whether facility designs deliver the expected reductions [188, 221]. Internal QHSE audit systems provide the operator-side counterpart to such external verification [356].

5.3. Application to Real Fields

The model can be calibrated to a specific field. Decline curves and gas-oil ratios can be fitted to production data [307, 308], gathering hydraulics can be calibrated against measured pressures with steady-state or transient network models [31, 271, 281], compressor and VRU availability can be estimated from maintenance records [13, 14] kept under reliability and integrity management programmes such as those for upstream fired heaters and boilers [357], and midstream outage statistics can be obtained from operator and midstream data [6]. Gathering routes and pad locations can be taken from GIS-based asset management systems [358]. Tank vapor generation can be estimated from separator conditions and laboratory flash analysis [168, 236], and flare destruction efficiency from measurement campaigns [8, 9]. The optimization could be extended to mixed-integer formulations of gathering network design with exact hydraulics [288, 289], to stochastic programming over development scenarios [267, 312, 315], to modular and relocatable facilities [303–305] to integrated production optimization including gas lift [28, 331, 333], and to data-driven control of compressors and VRUs using machine learning [359].

5.4. Limitations

The study has several limitations. All parameters are representative values from the literature rather than data from a specific field, so the absolute results should not be transferred without calibration. The gathering model uses the Weymouth equation for single-phase gas and neglects liquids, elevation and transient effects, which can be significant in rich-gas gathering [273, 339]. Liquids also drive internal corrosion of gathering lines and vessels, so integrity costs from corrosion management [360] and NDT-based risk assessment [361] are not included. The back-pressure effect on production is represented by a linear deliverability factor rather than a coupled reservoir and well model [337, 342]. Compressor, VRU and midstream availability are modelled as independent processes, whereas common causes such as weather can affect several at once [268, 299]. The gas price is assumed constant, although regional prices can fall sharply when takeaway is constrained [6]. Finally, the economic treatment of curtailment, with 30 percent of curtailed oil value lost, is a simplification of deferral and reservoir effects, and the optimal designs near the 98 percent threshold are sensitive to it.

6. Conclusion

This study optimized the gathering, compression, vapor recovery and outage policy of a representative onshore oil field for flaring and venting intensity and net present value, using Weymouth gathering hydraulics, back-pressure effects on production, daily stochastic simulation of compressor, vapor recovery and midstream availability, and NSGA-II. The legacy design flared mainly because its gathering system could not carry the peak production of staged development. Debottlenecking gathering created most of the value but shifted flaring to compression shortfalls and tank vapor, so that flaring reduction required gathering, compression, vapor recovery and outage policy to be designed together. A seventh compressor and vapor recovery on high-volume pads achieved most of the achievable reduction at about USD 24 per tonne, whereas meeting 98 percent capture cost about USD 103 per tonne and exceeding it far more. Even a high carbon price did not make 98 percent capture the value-maximizing choice, and compliance depended on midstream reliability and capacity.

For operators, the results support sizing gathering for the development peak, providing compression redundancy, installing vapor recovery with redundancy at high-volume pads and planning for midstream outages. For regulators, they show that capture targets interact with midstream reliability. Further work should calibrate the approach with field data, add multiphase and transient hydraulics and couple it with reservoir and development planning.

References

  1. Elvidge CD, Zhizhin M, Baugh K, Hsu FC, Ghosh T. Methods for global survey of natural gas flaring from Visible Infrared Imaging Radiometer Suite data. Energies. 2016;9(1):14. doi:10.3390/en9010014 https://doi.org/10.3390/en9010014
  2. Elvidge CD, Bazilian MD, Zhizhin M, Ghosh T, Baugh K, Hsu FC. The potential role of natural gas flaring in meeting greenhouse gas mitigation targets. Energy Strategy Reviews. 2018;20:156-162. doi:10.1016/j.esr.2017.12.012 https://doi.org/10.1016/j.esr.2017.12.012
  3. Ismail OS, Umukoro GE. Global impact of gas flaring. Energy and Power Engineering. 2012;4:290-302. doi:10.4236/epe.2012.44039 https://doi.org/10.4236/epe.2012.44039
  4. Soltanieh M, Zohrabian A, Gholipour MJ, Kalnay E. A review of global gas flaring and venting and impact on the environment: Case study of Iran. International Journal of Greenhouse Gas Control. 2016;49:488-509. doi:10.1016/j.ijggc.2016.02.010 https://doi.org/10.1016/j.ijggc.2016.02.010
  5. Salmon R, Logan A. Flaring up: North Dakota natural gas flaring more than doubles in two years. Ceres; 2013.
  6. Lu, R., Miskimins, J. L., & Zhizhin, M. (2021). Learning from nighttime observations of gas flaring in North Dakota for better decision and policy making. Remote Sensing, 13(5), 941. https://doi.org/10.3390/rs13050941 https://doi.org/10.3390/rs13050941
  7. Gvakharia A, Kort EA, Brandt A, Peischl J, Ryerson TB, Schwarz JP, et al. Methane, black carbon, and ethane emissions from natural gas flares in the Bakken Shale, North Dakota. Environmental Science & Technology. 2017;51(9):5317-5325. doi:10.1021/acs.est.6b05183 https://doi.org/10.1021/acs.est.6b05183
  8. Allen DT, Smith D, Torres VM, Saldaña FC. Carbon dioxide, methane and black carbon emissions from upstream oil and gas flaring in the United States. Current Opinion in Chemical Engineering. 2016;13:119-123.
  9. Yu, W., Song, S., Li, Y., Min, Y., Huang, W., Wen, K., & Gong, J. (2018). Gas supply reliability assessment of natural gas transmission pipeline systems. Energy, 162, 853-870.
  10. Li, X., Xue, Y., Li, Y., & Feng, Q. (2022). An optimization method for a compressor standby scheme based on reliability analysis. Energies, 15(21).
  11. Johnson D, Clark N, Heltzel R, Darzi M, Footer TL, Herndon S, et al. Methane emissions from oil and gas production sites and their storage tanks in West Virginia. Atmospheric Environment: X. 2022;16:100193.
  12. North Dakota Industrial Commission. Order No. 24665 (gas capture policy). North Dakota Industrial Commission, Oil and Gas Division; 2015.
  13. New Mexico Energy, Minerals, Natural Resources Department, Oil Conservation Division. Natural gas waste reduction rules (98 percent gas capture by end of 2026). New Mexico Register; 2021.
  14. U.S. Department of Energy, Office of Oil, Natural Gas. Natural gas flaring and venting: State and federal regulatory overview, trends, and impacts. U.S. Department of Energy; 2019.
  15. Cutler J, Hamso B, Sucre F. ‘Zero Routine Flaring by 2030’: A new global industry standard. The APPEA Journal. 2018;58:533-537.
  16. Hagos FY, Abd Aziz AR, Zainal EZ, Mofijur M, Ahmed SF. Recovery of gas waste from the petroleum industry: A review. Environmental Chemistry Letters. 2022;20(1):263-281. doi:10.1007/s10311-021-01345-1 https://doi.org/10.1007/s10311-021-01345-1
  17. Mansoor R, Tahir M. Recent developments in natural gas flaring reduction and reformation to energy-efficient fuels: A review. Energy & Fuels. 2021;35(5):3675-3714. doi:10.1021/acs.energyfuels.0c04269 https://doi.org/10.1021/acs.energyfuels.0c04269
  18. U.S. Environmental Protection Agency Natural Gas STAR Program, & Devon Energy. (2005). Installing vapor recovery units to reduce methane losses: Lessons learned from Natural Gas STAR. Producers Technology Transfer Workshop, Casper, WY (U.S. EPA).
  19. U.S. Environmental Protection Agency. Lessons learned from Natural Gas STAR partners: Installing vapor recovery units on storage tanks. U.S. EPA Natural Gas STAR Program; 2006.
  20. Ríos-Mercado RZ, Borraz-Sánchez C. Optimization problems in natural gas transportation systems: A state-of-the-art review. Applied Energy. 2015;147:536-555. doi:10.1016/j.apenergy.2015.03.017 https://doi.org/10.1016/j.apenergy.2015.03.017
  21. Babonneau F, Nesterov Y, Vial JP. Design and operations of gas transmission networks. Operations Research. 2012;60(1):34-47.
  22. Codas A, Camponogara E. Mixed-integer linear optimization for optimal lift-gas allocation with well-separator routing. European Journal of Operational Research. 2012;217(1):222-231.
  23. Kosmidis VD, Perkins JD, Pistikopoulos EN. A mixed integer optimization formulation for the well scheduling problem on petroleum fields. Computers & Chemical doi:10.1016/j.compchemeng.2004.12.003 https://doi.org/10.1016/j.compchemeng.2004.12.003
  24. Menon ES. Gas pipeline hydraulics. Taylor & Francis (CRC Press), Boca Raton, FL; 2005.
  25. Hu, Y., Bie, Z., Ding, T., & Lin, Y. (2016). An NSGA-II based multi-objective optimization for combined gas and electricity network expansion planning. Applied Energy, 167, 280-293. https://doi.org/10.1016/j.apenergy.2015.10.148 https://doi.org/10.1016/j.apenergy.2015.10.148
  26. Ray T, Sarker R. Genetic algorithm for solving a gas lift optimization problem. Journal of Petroleum Science and doi:10.1016/j.petrol.2007.03.004 https://doi.org/10.1016/j.petrol.2007.03.004
  27. Emam EA. Gas flaring in industry: An overview. Petroleum and Coal. 2015;57:532-555.
  28. Clean Air Task Force. Putting out the fire: Reducing flaring in tight oil fields. Clean Air Task Force; 2015.
  29. Ibrahim AY, Ghallab AO, Gadalla MA, Makary SS, Ashour FH. Technical and economical/financial feasibility analyses of flared gas recovery in Egypt from oil and gas industry from international/national oil companies’ perspectives. Clean Technologies and Environmental Policy. 2017;19(5):1423-1436.
  30. Castelo Branco DA, Szklo AS, Schaeffer R. CO2e emissions abatement costs of reducing natural gas flaring in Brazil by investing in offshore GTL plants producing premium diesel. Energy. 2010;35(1):158-167. doi:10.1016/j.energy.2009.09.006 https://doi.org/10.1016/j.energy.2009.09.006
  31. U.S. Government Accountability Office. Natural gas flaring and venting: Opportunities to improve data and reduce emissions. U.S. GAO; 2004.
  32. Elvidge CD, Zhizhin M, Hsu FC, Baugh KE. VIIRS Nightfire: Satellite pyrometry at night. Remote Sensing. 2013;5:4423-4449. doi:10.3390/rs5094423 https://doi.org/10.3390/rs5094423
  33. Elvidge CD, Ziskin D, Baugh KE, Tuttle BT, Ghosh T, Pack DW, et al. A fifteen year record of global natural gas flaring derived from satellite data. Energies. 2009;2(3):595-622. doi:10.3390/en20300595 https://doi.org/10.3390/en20300595
  34. Elvidge CD, Zhizhin M, Baugh K, Hsu FC, Ghosh T. Extending nighttime combustion source detection limits with short wavelength VIIRS data. Remote Sensing. 2019;11:395. doi:10.3390/rs11040395 https://doi.org/10.3390/rs11040395
  35. Casadio S, Arino O, Serpe D. Gas flaring monitoring from space using the ATSR instrument series. Remote Sensing of Environment. 2012;116:239-249.
  36. Casadio S, Arino O, Minchella A. Use of ATSR and SAR measurements for the monitoring and characterisation of night-time gas flaring from off-shore platforms: The North Sea test case. Remote Sensing of Environment. 2012;123:175-186.
  37. Fisher D, Wooster MJ. Multi-decade global gas flaring change inventoried using the ATSR-1, ATSR-2, AATSR and SLSTR data records. Remote Sensing of Environment. 2019;232:111298. doi:10.1016/j.rse.2019.111298 https://doi.org/10.1016/j.rse.2019.111298
  38. Caseiro A, Rücker G, Tiemann J, Leimbach D, Lorenz E, Frauenberger O, et al. Persistent hot spot detection and characterisation using SLSTR. Remote Sensing, 10, 1118. 2018. doi:10.3390/rs10071118 https://doi.org/10.3390/rs10071118
  39. Sharma A, Wang J, Lennartson EM. Intercomparison of MODIS and VIIRS fire products in Khanty-Mansiysk Russia: Implications for characterizing gas flaring from space. Atmosphere. 2017;8:95. doi:10.3390/atmos8060095 https://doi.org/10.3390/atmos8060095
  40. Anejionu OCD, Blackburn GA, Whyatt JD. Detecting gas flares and estimating flaring volumes at individual flow stations using MODIS data. Remote Sensing of Environment. 2015;158:81-94.
  41. Anejionu OCD, Blackburn GA, Whyatt JD. Satellite survey of gas flares: Development and application of a Landsat based technique in the Niger Delta. International Journal of Remote Sensing. 2014;35:1900-1925. doi:10.1080/01431161.2013.879351 https://doi.org/10.1080/01431161.2013.879351
  42. Faruolo M, Coviello I, Filizzola C, Lacava T, Pergola N, Tramutoli V. A satellite-based analysis of the Val d’Agri Oil Center (southern Italy) gas flaring emissions. Natural Hazards and Earth System Sciences. 2014;14:2783-2793. doi:10.5194/nhess-14-2783-2014 https://doi.org/10.5194/nhess-14-2783-2014
  43. Faruolo M, Lacava T, Pergola N, Tramutoli V. On the potential of the RST-FLARE algorithm for gas flaring characterization from space. Sensors. 2018;18:2466. doi:10.3390/s18082466 https://doi.org/10.3390/s18082466
  44. Faruolo M, Lacava T, Pergola N, Tramutoli V. The VIIRS-based RST-FLARE configuration: The Val d’Agri oil center gas flaring investigation in between 2015-2019. Remote Sensing. 2020;12(5):819. doi:10.3390/rs12050819 https://doi.org/10.3390/rs12050819
  45. Liu, Y., Hu, C., Zhan, W., Sun, C., Murch, B., & Ma, L. (2018). Identifying industrial heat sources using time-series of the VIIRS Nightfire product with an object-oriented approach. Remote Sensing of Environment, 204, 347-365. https://doi.org/10.1016/j.rse.2017.10.019 https://doi.org/10.1016/j.rse.2017.10.019
  46. Zhang X, Scheving B, Shoghli B, Zygarlicke C, Wocken C. Quantifying gas flaring CH4 consumption using VIIRS. Remote Sensing, 7, 9529-9541. 2015.
  47. Johnson MR, Kostiuk LW. A parametric model for the efficiency of a flare in crosswind. Proceedings of the Combustion Institute. 2002;29:1943-1950. doi:10.1016/S1540-7489(02)80236-X https://doi.org/10.1016/S1540-7489(02)80236-X
  48. Johnson MR, Kostiuk LW. Efficiencies of low-momentum jet diffusion flames in crosswinds. Combustion and Flame. 2000;123:189-200.
  49. Castiñeira D, Edgar TF. Computational fluid dynamics for simulation of wind-tunnel experiments on flare combustion systems. Energy & Fuels. 2008;22:1698-1706. doi:10.1021/ef700545j https://doi.org/10.1021/ef700545j
  50. Singh, K., Gangadharan, P., Dabade, T., Shinde, V., Chen, D., Lou, H., Richmond, P., & Li, X. (2014). Parametric study of ethylene flare operations using numerical simulation. Engineering Applications of Computational Fluid Mechanics, 8, 211-228. https://doi.org/10.1080/19942060.2014.11015508 https://doi.org/10.1080/19942060.2014.11015508
  51. Allen D, Torres V. TCEQ 2010 flare study final report. Texas Commission on Environmental Quality; 2011.
  52. Knighton WB, Herndon SC, Franklin JF, Wood EC, Wormhoudt J, Brooks W, et al. Direct measurement of volatile organic compound emissions from industrial flares using real-time online techniques: Proton transfer reaction mass spectrometry and tunable infrared laser differential absorption spectroscopy. Industrial & Engineering Chemistry Research. 2012;51:12674-12684.
  53. Stohl A, Klimont Z, Eckhardt S, Kupiainen K, Shevchenko VP, Kopeikin VM, et al. Black carbon in the Arctic: The underestimated role of gas flaring and residential combustion emissions. Atmospheric Chemistry and Physics. 2013;13(17):8833-8855. doi:10.5194/acp-13-8833-2013 https://doi.org/10.5194/acp-13-8833-2013
  54. Weyant CL, Shepson PB, Subramanian R, Cambaliza MOL, Heimburger A, McCabe D, et al. Black carbon emissions from associated natural gas flaring. 2081.
  55. McEwen JDN, Johnson MR. Black carbon particulate matter emission factors for buoyancy-driven associated gas flares. Journal of the Air & Waste Management Association. 2012;62:307-321.
  56. Huang, K., & Fu, J. S. (2016). A global gas flaring black carbon emission rate dataset from 1994 to 2012. Scientific Data, 3, 160104. https://doi.org/10.1038/sdata.2016.104 https://doi.org/10.1038/sdata.2016.104
  57. Schwarz JP, Holloway JS, Katich JM, McKeen S, Kort EA, Smith ML, et al. Black carbon emissions from the Bakken oil and gas development region. Environmental Science & Technology Letters. 2015;2:281-285.
  58. Chen C, McCabe DC, Fleischman LE, Cohan DS. Black carbon emissions and associated health impacts of gas flaring in the United States. Atmosphere. 2022;13(3):385. doi:10.3390/atmos13030385 https://doi.org/10.3390/atmos13030385
  59. Böttcher K, Paunu VV, Kupiainen K. Black carbon emissions from flaring in Russia in the period 2012-2017. Atmospheric Environment. 2021;254:118390.
  60. Deetz K, Vogel B. Development of a new gas-flaring emission dataset for southern West Africa. Geoscientific Model Development. 2017;10:1607-1620. doi:10.5194/gmd-10-1607-2017 https://doi.org/10.5194/gmd-10-1607-2017
  61. Anejionu OCD, Whyatt JD, Blackburn GA, Price CS. Contributions of gas flaring to a global air pollution hotspot: Spatial and temporal variations, impacts and alleviation. Atmospheric Environment. 2015;118:184-
  62. doi:10.1016/j.atmosenv.2015.08.006 https://doi.org/10.1016/j.atmosenv.2015.08.006
  63. Motte J, Alvarenga RAF, Thybaut JW, Dewulf J. Quantification of the global and regional impacts of gas flaring on human health via spatial differentiation. Environmental Pollution. 2021;291:118213.
  64. Nwosisi M, Oguntoke O, Taiwo A, Agbozu I, Noragbon E. Spatial patterns of gas flaring stations and the risk to the respiratory and dermal health of residents of the Niger Delta, Nigeria. Scientific African. 2021;12:e00762.
  65. Giwa SO, Nwaokocha CN, Kuye SI, Adama KO. Gas flaring attendant impacts of criteria and particulate pollutants: A case of Niger Delta region of Nigeria. Journal of King Saud University - Engineering Sciences. 2019;31:209-217. doi:10.1016/j.jksues.2017.04.003 https://doi.org/10.1016/j.jksues.2017.04.003
  66. Cushing LJ, Vavra MK, Chau K, Franklin M, Johnston JE. Flaring from unconventional oil and gas development and birth outcomes in the Eagle Ford Shale in South Texas. Environmental Health Perspectives. 2020;128(7):077003.
  67. Cushing LJ, Chau K, Franklin M, Johnston JE. Up in smoke: Characterizing the population exposed to flaring from unconventional oil and gas development in the contiguous US. Environmental Research Letters, 16, 034032. 2021.
  68. Willis M, Hystad P, Denham A, Hill E. Natural gas development, flaring practices and paediatric asthma hospitalizations in Texas. International Journal of Epidemiology. 2020;49:1883-1896. doi:10.1093/ije/dyaa115 https://doi.org/10.1093/ije/dyaa115
  69. Hassan A, Kouhy R. Gas flaring in Nigeria: Analysis of changes in its consequent carbon emission and reporting. Accounting Forum. 2013;37:124-134. doi:10.1016/j.accfor.2013.04.004 https://doi.org/10.1016/j.accfor.2013.04.004
  70. Anomohanran O. Determination of greenhouse gas emission resulting from gas flaring activities in Nigeria. Energy Policy. 2012;45:666-670. doi:10.1016/j.enpol.2012.03.018 https://doi.org/10.1016/j.enpol.2012.03.018
  71. Akeredolu FA, Sonibare JA. A review of the usefulness of gas flares in air pollution control. Management of Environmental Quality: An International Journal. 2004;15:574-583. doi:10.1108/14777830410560674 https://doi.org/10.1108/14777830410560674
  72. Ominyi M, Anichukwueze CC. Reviewing greenhouse gas disclosure and ESG compliance obligations for energy and infrastructure enterprises under evolving regulatory regimes. International Journal of Economics and Financial Management. 2022;7(6):94-124. doi:10.56201/ijefm.v7.no6.2022.pg94.124 https://doi.org/10.56201/ijefm.v7.no6.2022.pg94.124
  73. Uchechi N, Ominyi M, Anichukwueze CC, Jones BC. Corporate policy advocacy and regulatory reform: Streamlining statutory bidding workflows in emerging energy markets. Iconic Research and Engineering Journals. 2019;3(5):672-709. doi:10.64388/IREV3I5-1722791 https://doi.org/10.64388/IREV3I5-1722791
  74. Zirogiannis N, Alcorn J, Rupp J, Carley S, Graham JD. State regulation of unconventional gas development in the U.S.: An empirical evaluation. Energy Research & Social Science. 2016;11:142-154.
  75. Gomes Relva S, Oliveira da Silva V, Peyerl D, Veiga Gimenes AL, Molares Udaeta ME. Regulating the electro-energetic use of natural gas by gas-to-wire offshore technology: Case study from Brazil. Utilities Policy. 2020;66:101085. doi:10.1016/j.jup.2020.101085 https://doi.org/10.1016/j.jup.2020.101085
  76. Rodrigues ACC. Decreasing natural gas flaring in Brazilian oil and gas industry. Resources Policy. 2022;77.
  77. Skobelina VP, Tremasova IS. Measures of stimulation of use of associated petroleum gas. Journal of Mining Institute. 2013;205:258-262.
  78. Sonibare JA, Akeredolu FA. Natural gas domestic market development for total elimination of routine flares in Nigeria’s upstream petroleum operations. Energy Policy. 2006;34:743-753. doi:10.1016/j.enpol.2004.07.006 https://doi.org/10.1016/j.enpol.2004.07.006
  79. Brandt AR, Yeskoo T, McNally MS, Vafi K, Yeh S, Cai H, et al. Energy intensity and greenhouse gas emissions from tight oil production in the Bakken formation. Energy & Fuels. 2016;30:9613-9621.
  80. Zadakbar O, Vatani A, Karimpour K. Flare gas recovery in oil and gas refineries. Oil & Gas Science and Technology - Revue de l’IFP. 2008;63(6):705-711. doi:10.2516/ogst:2008023 https://doi.org/10.2516/ogst:2008023
  81. Hajizadeh A, Mohamadi-Baghmolaei M, Azin R, Osfouri S, Heydari I. Technical and economic evaluation of flare gas recovery in a giant gas refinery. Chemical Engineering Research and Design. 2018;131:506-519. doi:10.1016/j.cherd.2017.11.026 https://doi.org/10.1016/j.cherd.2017.11.026
  82. Rahimpour MR, Jokar SM. Feasibility of flare gas reformation to practical energy in Farashband gas refinery: No gas flaring. Journal of Hazardous Materials. 2012;209:204-217. doi:10.1016/j.jhazmat.2012.01.017 https://doi.org/10.1016/j.jhazmat.2012.01.017
  83. Ghadyanlou F, Vatani A. Flare-gas recovery methods for olefin plants. Chemical Engineering. 2015;122:66.
  84. Beigiparast S. Flare gas reduction in an olefin plant under different start-up procedures. Energy. 2021;214.
  85. Abdulrahman AO, Huisingh D, Hafkamp W. Sustainability improvements in Egypt’s oil & gas industry by implementation of flare gas recovery. Journal of Cleaner Production. 2015;98:116-122. doi:10.1016/j.jclepro.2014.11.086 https://doi.org/10.1016/j.jclepro.2014.11.086
  86. Elhagar M, El-Emam N, Awad M, Ahmed AZ, Aboul-Fotouh TM. Increase flared gas recovery and emission reduction by separator optimization. International Journal of Energy and Environmental Engineering. 2021;12(1):115-130. doi:10.1007/s40095-020-00363-z https://doi.org/10.1007/s40095-020-00363-z
  87. Petri Y, Hidayati J, Humala N. Technical and economic analysis use of flare gas into alternative energy as a breakthrough in achieving zero routine flaring. IOP Conference Series: Earth and Environmental Science. 2018;126:012132. doi:10.1088/1755-1315/126/1/012132 https://doi.org/10.1088/1755-1315/126/1/012132
  88. Hamidzadeh Z, Sattari S, Soltanieh M, Vatani A. Development of a multi-objective decision-making model to recover flare gases in a multi flare gases zone. Energy. 2020;203:117815. doi:10.1016/j.energy.2020.117815 https://doi.org/10.1016/j.energy.2020.117815
  89. Ibañez-Gómez LF, Albarracín-Quintero S, Céspedes-Zuluaga S, Montes-Páez E, Ando Junior OH, Carmo JP, et al. Process optimization of the flaring gas for field applications. Energies. 2022;15(20):1-19.
  90. Mourad D, Ghazi O, Noureddine B. Recovery of flared gas through crude oil stabilization by a multi-staged separation with intermediate feeds: A case study. Korean Journal of Chemical Engineering. 2009;26:1706-1716.
  91. Xu, Q., Yang, X., Liu, C., Li, K., Lou, H. H., & Gossage, J. L. (2009). Chemical plant flare minimization via plantwide dynamic simulation. Industrial & Engineering Chemistry Research, 48, 3505-3512. https://doi.org/10.1021/ie8016219 https://doi.org/10.1021/ie8016219
  92. Eshaghi S, Hamrang F. An innovative techno-economic analysis for the selection of an integrated ejector system in the flare gas recovery of a refinery plant. Energy. 2021;228:120594. doi:10.1016/j.energy.2021.120594 https://doi.org/10.1016/j.energy.2021.120594
  93. Parivazh MM. The feasibility study, exergy, and exergoeconomic analyses of a novel flare gas recovery system. Sustainability. 2022;14(15):1-23.
  94. Nezhadfard M, Khalili-Garakani A. Power generation as a useful option for flare gas recovery: Enviro-economic evaluation of different scenarios. Energy. 2020;204.
  95. Heidari M, Ataei A, Rahdar MH. Development and analysis of two novel methods for power generation from flare gas. Applied Thermal Engineering. 2016;104:687-
  96. doi:10.1016/j.applthermaleng.2016.05.099 https://doi.org/10.1016/j.applthermaleng.2016.05.099
  97. Saidi M. Application of catalytic membrane reactor for pure hydrogen production by flare gas recovery as a novel approach. International Journal of Hydrogen Energy. 2018;43(31):14834-14847. doi:10.1016/j.ijhydene.2018.05.156 https://doi.org/10.1016/j.ijhydene.2018.05.156
  98. Khanipour M, Mirvakili A, Bakhtyari A, Farniaei M, Rahimpour MR. A membrane-assisted hydrogen and carbon oxides separation from flare gas and recovery to a commercial methanol reactor. International Journal of Hydrogen Energy. 2020;45(12):7386-7400. doi:10.1016/j.ijhydene.2019.04.149 https://doi.org/10.1016/j.ijhydene.2019.04.149
  99. Beal CM, Davidson FT, Webber ME, Quinn JC. Flare gas recovery for algal protein production. Algal Research. 2016;20:142-152. doi:10.1016/j.algal.2016.09.022 https://doi.org/10.1016/j.algal.2016.09.022
  100. Barekat-Rezaei E, Farzaneh-Gord M, Arjomand A, Jannatabadi M, Ahmadi MH, Yan WM. Thermo-economical evaluation of producing liquefied natural gas and natural gas liquids from flare gases. Energies. 2018;11(7):1868. doi:10.3390/en11071868 https://doi.org/10.3390/en11071868
  101. Wood DA, Nwaoha C, Towler BF. Gas-to-liquids (GTL): A review of an industry offering several routes for monetizing natural gas. Journal of Natural Gas Science and Engineering. 2012;9:196-208.
  102. Stanley IO. Gas-to-liquid technology: Prospect for natural gas utilisation in Nigeria. Journal of Natural Gas Science and Engineering. 2009;1:190-194.
  103. Gabriel KJ, Noureldin M, El-Halwagi MM, Linke P, Jiménez-Gutiérrez A, Martínez DY. Gas-to-liquid (GTL) technology: Targets for process design and water-energy nexus. Current Opinion in Chemical Engineering. 2014;5:49-54. doi:10.1016/j.coche.2014.05.001 https://doi.org/10.1016/j.coche.2014.05.001
  104. Rahimpour MR, Ghorbani A, Asiaee A, Shariati A. Conversion of refinery natural purge gases to liquid hydrocarbons in GTL loop with hydrogen-permselective membranes: An alternative to gas flaring. Journal of Natural Gas Science and Engineering. 2011;3(3):461-
  105. doi:10.1016/j.jngse.2011.04.004 https://doi.org/10.1016/j.jngse.2011.04.004
  106. Ghorbani A, Jafari M, Rahimpour MR. A comparative simulation of a novel gas to liquid (GTL) conversion loop as an alternative to a certain refinery gas flare. Journal of Natural Gas Science and Engineering. 2013;11:23-38. doi:10.1016/j.jngse.2012.11.002 https://doi.org/10.1016/j.jngse.2012.11.002
  107. Behroozsarand A, Zamaniyan A. Simulation and optimization of an integrated GTL process. Journal of Cleaner Production. 2017;142(4):2315-2327. doi:10.1016/j.jclepro.2016.11.045 https://doi.org/10.1016/j.jclepro.2016.11.045
  108. Junior SA, Meneguelo AP, Arrieche L, Bacelos M. Assessment of a process flow diagram for NGL recovery using different condensation mechanisms. Computers & Chemical Engineering. 2019;130:106557. doi:10.1016/j.compchemeng.2019.106557 https://doi.org/10.1016/j.compchemeng.2019.106557
  109. Brito TLF, Galvão C, Fonseca AF, Costa HKM, Moutinho dos Santos E. A review of gas-to-wire (GtW) projects worldwide: State-of-art and developments. Energy Policy. 2022;163:112859. doi:10.1016/j.enpol.2022.112859 https://doi.org/10.1016/j.enpol.2022.112859
  110. Dong L, Wei S, Tan S, Zhang H. GTL or LNG: Which is the best way to monetize stranded natural gas?. Petroleum Science, 5(4), 388-394. 2008.
  111. Thomas S, Dawe RA. Review of ways to transport natural gas energy from countries which do not need the gas for domestic use. Energy. 2003;28(14):1461-1477.
  112. Snytnikov PV, Potemkin DI, Uskov SI, Kurochkin AV, Kirillov VA, Sobyanin VA. Approaches to utilizing flare gases at oil and gas fields: A review. Catalysis in Industry. 2018;10(3):202-216. doi:10.1134/S207005041803011X https://doi.org/10.1134/S207005041803011X
  113. Global Gas Flaring Reduction Partnership. GGFR technology overview: Utilization of small-scale associated gas. World Bank; 2018.
  114. World Bank. Flared gas utilization strategy: Opportunities for small-scale uses of gas. World Bank; 2004.
  115. Mokhatab S, Poe WA, Mak JY. Handbook of natural gas transmission and processing: Principles and practices (3rd ed.). Gulf Professional Publishing; 2015.
  116. Alvarez RA, Zavala-Araiza D, Lyon DR, Allen DT, Barkley ZR, Brandt AR. Assessment of methane emissions from the U.S. oil and gas supply chain. Science. 2018;361(6398):186-188.
  117. Alvarez RA, Pacala SW, Winebrake JJ, Chameides WL, Hamburg SP. Greater focus needed on methane leakage from natural gas infrastructure. Proceedings of the National Academy of Sciences. 2012;109:6435-6440.
  118. Brandt AR, Heath GA, Kort EA, O’Sullivan F, Pétron G, Jordaan SM. Methane leaks from North American natural gas systems. Science. 2014;343:733-735. doi:10.1126/science.1247045 https://doi.org/10.1126/science.1247045
  119. Allen DT. Methane emissions from natural gas production and use: Reconciling bottom-up and top-down measurements. Current Opinion in Chemical doi:10.1016/j.coche.2014.05.004 https://doi.org/10.1016/j.coche.2014.05.004
  120. Zavala-Araiza D, Alvarez RA, Lyon DR, Allen DT, Marchese AJ, Zimmerle DJ. Super-emitters in natural gas infrastructure are caused by abnormal process conditions. Nature Communications. 2017;8:14012. doi:10.1038/ncomms14012 https://doi.org/10.1038/ncomms14012
  121. Littlefield JA, Marriott J, Schivley GA, Skone TJ. Synthesis of recent ground-level methane emission measurements from the U.S. natural gas supply chain. Journal of Cleaner Production. 2017;148:118-126.
  122. Zavala-Araiza D, Lyon DR, Alvarez RA, Davis KJ, Harriss R, Herndon SC. Reconciling divergent estimates of oil and gas methane emissions. Proceedings of the National Academy of Sciences. 2015;112:15597-15602.
  123. Allen DT, Torres VM, Thomas J, Sullivan DW, Harrison M, Hendler A. Measurements of methane emissions at natural gas production sites in the United States. 2013;110:17768-17773. doi:10.1073/pnas.1304880110 https://doi.org/10.1073/pnas.1304880110
  124. Allen DT, Pacsi AP, Sullivan DW, Zavala-Araiza D, Harrison M, Keen K. Methane emissions from process equipment at natural gas production sites in the United States: Pneumatic controllers. Environmental Science & Technology. 2015;49:633-640. doi:10.1021/es5040156 https://doi.org/10.1021/es5040156
  125. Allen DT, Sullivan DW, Zavala-Araiza D, Pacsi AP, Harrison M, Keen K. Methane emissions from process equipment at natural gas production sites in the United States: Liquid unloadings. Environmental Science & Technology. 2015;49:641-648. doi:10.1021/es504016r https://doi.org/10.1021/es504016r
  126. Omara, M., Sullivan, M. R., Li, X., Subramanian, R., Robinson, A. L., & Presto, A. A. (2016). Methane emissions from conventional and unconventional natural gas production sites in the Marcellus Shale Basin. Environmental Science & Technology, 50, 2099-2107. https://doi.org/10.1021/acs.est.5b05503 https://doi.org/10.1021/acs.est.5b05503
  127. Omara M, Zavala-Araiza D, Lyon DR, Hmiel B, Roberts KA, Hamburg SP. Methane emissions from US low production oil and natural gas well sites. Nature Communications. 2022;13:2085. doi:10.1038/s41467-022-29709-3 https://doi.org/10.1038/s41467-022-29709-3
  128. Deighton JA, Townsend-Small A, Sturmer SJ, Hoschouer J, Heldman L. Measurements show that marginal wells are a disproportionate source of methane relative to production. Journal of the Air & Waste Management Association. 2020;70:1030-1042.
  129. Kang M, Kanno CM, Reid MC, Zhang X, Mauzerall DL, Celia MA. Direct measurements of methane emissions from abandoned oil and gas wells in Pennsylvania. 2014;111:18173-18177. doi:10.1073/pnas.1408315111 https://doi.org/10.1073/pnas.1408315111
  130. Riddick S. Measuring methane emissions from abandoned and active oil and gas wells in West Virginia. Science of the Total Environment. 2019;651:1849-1856.
  131. Thoma ED, Logan R, Deshmukh P, Dresser C, Stovern M, Brantley HL. Assessment of Uinta Basin oil and natural gas well pad pneumatic controller emissions. Journal of Environmental Protection. 2017;8:720-726.
  132. Newsom, V. L. (1997). Determination of methane emissions from crude oil stock tanks. SPE/EPA Exploration and Production Environmental Conference, Dallas, TX (SPE-37930).
  133. Frankenberg C, Thorpe AK, Thompson DR, Hulley G, Kort EA, Vance N. Airborne methane remote measurements reveal heavy-tail flux distribution in Four Corners region. Proceedings of the National Academy of Sciences. 2016;113:9734-9739.
  134. Kort EA, Frankenberg C, Costigan KR, Lindenmaier R, Dubey MK, Wunch D. Four corners: The largest US methane anomaly viewed from space. Geophysical Research Letters. 2014;41:6898-6903.
  135. Barkley ZR, Lauvaux T, Davis KJ, Deng A, Fried A, Weibring P. Estimating methane emissions from underground coal and natural gas production in southwestern Pennsylvania. Geophysical Research Letters. 2019;46:4531-4540.
  136. Foster CS, Crosman ET, Holland L, Mallia DV, Fasoli B, Bares R. Confirmation of elevated methane emissions in Utah’s Uintah Basin with ground-based observations and a high-resolution transport model. Journal of Geophysical Research: Atmospheres. 2017;122:13026-13044.
  137. Lyman SN, Tran T, Mansfield ML, Ravikumar AP. Aerial and ground-based optical gas imaging survey of Uinta Basin oil and gas wells. Elementa: Science of the Anthropocene. 2019;7:43.
  138. Peischl J. Quantifying methane and ethane emissions to the atmosphere from central and western U.S. oil and natural gas production regions. Journal of Geophysical Research: Atmospheres. 2018;123:7725-7740.
  139. Peischl J, Karion A, Sweeney C, Kort EA, Smith ML, Brandt AR, et al. Quantifying atmospheric methane emissions from oil and natural gas production in the Bakken shale region of North Dakota. Journal of Geophysical Research: Atmospheres. 2016;121:6101-6111.
  140. Kort EA, Smith ML, Murray LT, Gvakharia A, Brandt AR, Peischl J, et al. Fugitive emissions from the Bakken shale illustrate role of shale production in global ethane shift. Geophysical Research Letters. 2016;43:4617-4623.
  141. Zavala-Araiza D. Methane emissions from oil and gas production sites in Alberta, Canada. Elementa: Science of the Anthropocene. 2018;6:27.
  142. O’Connell E. Methane emissions from contrasting production regions within Alberta, Canada: Implications under incoming federal methane regulations. Elementa: Science of the Anthropocene; 2019.
  143. Zhang, Y., et al. (2020). Quantifying methane emissions from the largest oil-producing basin in the United States from space. Science Advances, 6, eaaz5120.
  144. Irakulis-Loitxate, I., et al. (2021). Satellite-based survey of extreme methane emissions in the Permian basin. Science Advances, 7, eabf4507.
  145. Cusworth DH. Intermittency of large methane emitters in the Permian Basin. Environmental Science & Technology Letters. 2021;8:567-573.
  146. Robertson AM. New Mexico Permian Basin measured well pad methane emissions are a factor of 5-9 times higher than U.S. EPA estimates. Environmental Science & Technology. 2020;54:13926-13934.
  147. Karion A, Sweeney C, Pétron G, Frost G, Hardesty RM, Kofler J. Methane emissions estimate from airborne measurements over a western United States natural gas field. Geophysical Research Letters. 2013;40:4393-4397.
  148. Cusworth DH. Strong methane point sources contribute a disproportionate fraction of total emissions across multiple basins in the United States. Proceedings of the National Academy of Sciences. 2022;119:e2202338119.
  149. Englander JG, Brandt AR, Conley S, Lyon DR, Jackson RB. Aerial interyear comparison and quantification of methane emissions persistence in the Bakken formation of North Dakota, USA. Environmental Science & Technology, 52, 8947-8953. 2018.
  150. Varon DJ. High-frequency monitoring of anomalous methane point sources with multispectral Sentinel-2 satellite observations. Atmospheric Measurement Techniques. 2021;14:2771-2785.
  151. Lauvaux T. Global assessment of oil and gas methane ultra-emitters. Science. 2022;375:557-561.
  152. Jacob DJ. Quantifying methane emissions from the global scale down to point sources using satellite observations of atmospheric methane. Atmospheric Chemistry and Physics. 2022;22:9617-9646.
  153. Hu, H., Landgraf, J., Detmers, R., Borsdorff, T., Aan de Brugh, J., Aben, I., et al. (2018). Toward global mapping of methane with TROPOMI: First results and intersatellite comparison to GOSAT. Geophysical Research Letters, 45, 3682-3689. https://doi.org/10.1002/2018GL077259 https://doi.org/10.1002/2018GL077259
  154. Bell C. Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR. Elementa: Science of the Anthropocene, 10, 00080. 2022.
  155. Thorpe AK, Frankenberg C, Roberts DA. Retrieval techniques for airborne imaging of methane concentrations using high spatial and moderate spectral resolution: Application to AVIRIS. Atmospheric Measurement Techniques, 7, 491-506. 2014.
  156. Conley S, Faloona I, Mehrotra S, Suard M, Lenschow DH, Sweeney C. Application of Gauss’s theorem to quantify localized surface emissions from airborne measurements of wind and trace gases. Atmospheric Measurement Techniques. 2017;10:3345-3358. doi:10.5194/amt-10-3345-2017 https://doi.org/10.5194/amt-10-3345-2017
  157. Conley S, Franco G, Faloona I, Blake DR, Peischl J, Ryerson TB. Methane emissions from the 2015 Aliso Canyon blowout in Los Angeles, CA. Science, 351, 1317-1320. 2016. doi:10.1126/science.aaf2348 https://doi.org/10.1126/science.aaf2348
  158. Allen DT, Cardoso-Saldaña FJ, Kimura Y. Variability in spatially and temporally resolved emissions and hydrocarbon source fingerprints for oil and gas sources in shale gas production regions. Environmental Science & Technology. 2017;51:12016-12026.
  159. Rutherford JS. Closing the methane gap in US oil and natural gas production emissions inventories. Nature Communications. 2021;12:4715.
  160. Bruhwiler LM. U.S. CH4 emissions from oil and gas production: Have recent large increases been detected?. Journal of Geophysical Research: Atmospheres, 122, 4070-4083. 2017.
  161. Howarth RW, Santoro R, Ingraffea A. Methane and the greenhouse-gas footprint of natural gas from shale formations. Climatic Change. 2011;106:679-690.
  162. Allen DT. Emissions from oil and gas operations in the United States and their air quality implications. Journal of the Air & Waste Management Association. 2016;66:549-575. doi:10.1080/10962247.2016.1171263 https://doi.org/10.1080/10962247.2016.1171263
  163. Balcombe P, Anderson K, Speirs J, Brandon N, Hawkes A. The natural gas supply chain: The importance of methane and carbon dioxide emissions. ACS Sustainable Chemistry & Engineering. 2017;5:3-20.
  164. Kirschke S. Three decades of global methane sources and sinks. Nature Geoscience. 2013;6:813-823.
  165. Howard T, Ferrara TW, Townsend-Small A. Sensor transition failure in the high flow sampler: Implications for methane emission inventories of natural gas infrastructure. Journal of the Air & Waste Management Association. 2015;65:856-862. doi:10.1080/10962247.2015.1025925 https://doi.org/10.1080/10962247.2015.1025925
  166. Alvarez RA, Lyon DR, Marchese AJ, Robinson AL, Hamburg SP. Possible malfunction in widely used methane sampler deserves attention but poses limited implications for supply chain emission estimates. Elementa: Science of the Anthropocene. 2016;4:000137. doi:10.12952/journal.elementa.000137 https://doi.org/10.12952/journal.elementa.000137
  167. Marten AL, Kopits EA, Griffiths CW, Newbold SC, Wolverton A. Incremental CH4 and N2O mitigation benefits consistent with the US government’s SC-CO2 estimates. Climate Policy. 2015;15:272-298.
  168. Evans, G. B., & Nelson, R. (1968). Applications of vapor recovery to crude oil production. Society of Petroleum Engineers (SPE-2089).
  169. Griswold, J. A., & Ambler, T. C. (1978). A practical approach to crude oil stock tank vapor recovery. SPE Rocky Mountain Regional Meeting, Cody, WY (SPE-7175).
  170. Liu, D., & Meachen, J. V., Jr. (1993). The use of vapor recovery units in the Austin Chalk field. SPE Annual Technical Conference and Exhibition, Houston, TX
  171. Webb, W. G. (1993). Vapor jet system: An alternate vapor recovery method. SPE/EPA Exploration and Production Environmental Conference, San Antonio, TX
  172. Choi, M. S. (1993). API tank vapors project. SPE Annual Technical Conference and Exhibition, Houston, TX
  173. Lucas, D., Littlejohn, D., Orlando, E., & Lindsey, R. P. (1997). The heavy oil storage tank project. SPE/EPA Exploration and Production Environmental Conference, Dallas, TX (SPE-37886).
  174. Fox TA, Barchyn TE, Risk D, Ravikumar AP, Hugenholtz CH. A review of close-range and screening technologies for mitigating fugitive methane emissions in upstream oil and gas. Environmental Research Letters. 2019;14(5):053002. doi:10.1088/1748-9326/ab0cc3 https://doi.org/10.1088/1748-9326/ab0cc3
  175. Ravikumar AP, Wang J, Brandt AR. Are optical gas imaging technologies effective for methane leak detection?. Environmental Science & Technology, 51, 718-724. 2017. doi:10.1021/acs.est.6b03906 https://doi.org/10.1021/acs.est.6b03906
  176. Ravikumar, A. P., Roda-Stuart, D., Liu, R., Bradley, A., Bergerson, J., Nie, Y., Zhang, S., Bi, X., & Brandt, A. R. (2020). Repeated leak detection and repair surveys reduce methane emissions over scale of years. Environmental Research Letters, 15, 034029. https://doi.org/10.1088/1748-9326/ab6ae1 https://doi.org/10.1088/1748-9326/ab6ae1
  177. Ravikumar AP, Brandt AR. Designing better methane mitigation policies: The challenge of distributed small sources in the natural gas sector. Environmental Research Letters. 2017;12:044023. doi:10.1088/1748-9326/aa6791 https://doi.org/10.1088/1748-9326/aa6791
  178. Gould T, McGlade C, Schulz R. Methane emissions from oil and gas. International Energy Agency; 2020.
  179. Üster H, Dilaveroğlu, Ş. Optimization for design and operation of natural gas transmission networks. Applied Energy. 2014;133:56-69. doi:10.1016/j.apenergy.2014.06.042 https://doi.org/10.1016/j.apenergy.2014.06.042
  180. Lenz R, Serrano F. Tight convex relaxations for the expansion planning problem. Journal of Optimization Theory and Applications. 2022;194(1):325-352.
  181. Domschke P, Geißler B, Kolb O, Lang J, Martin A, Morsi A. Combination of nonlinear and linear optimization of transient gas networks. INFORMS Journal on Computing. 2011;23(4):605-617.
  182. Ríos-Mercado, R. Z., Wu, S., Scott, L. R., & Boyd, E. A. (2002). A reduction technique for natural gas transmission network optimization problems. Annals of Operations Research, 117(1), 217-234.
  183. Contesse L, Ferrer J, Maturana S. A mixed-integer programming model for gas purchase and transportation. Annals of Operations Research. 2005;139(1):39-63.
  184. De Wolf D, Smeers Y. The gas transmission problem solved by an extension of the simplex algorithm. Management Science. 2000;46(11):1454-1465.
  185. O’Neill RP, Williard M, Wilkins B, Pike R. A mathematical programming model for allocation of natural gas. Operations Research. 1979;27(5):857-873.
  186. Li, X., Tomasgard, A., & Barton, P. I. (2012). Decomposition strategy for the stochastic pooling problem. Journal of Global Optimization, 54(4), 765-790.
  187. Alzbutas R, Iešmantas T. Stochastic simulation of flow rate and power consumption considering the uncertainty of pipeline cracking rate and time-dependent topology of a natural gas transmission network. Energies. 2022;15(13).
  188. Zapukhliak, V., Poberezhny, L., Maruschak, P., Grudz, V., Jr., Stasiuk, R., Brezinová, J., & Guzanová, A. (2019). Mathematical modeling of unsteady gas transmission system operating conditions under insufficient loading. Energies, 12(7).
  189. An, J., & Peng, S. (2018). Prediction and verification of risk loss cost for improved natural gas network layout optimization. Energy, 148, 1181-1190.
  190. Osiadacz AJ, Kwestarz M. Nonlinear steady-state optimization of large-scale gas transmission networks. Energies. 2021;14(10):2832.
  191. Mikolajková M, Saxén H, Pettersson F. Linearization of an MINLP model and its application to gas distribution optimization. Energy. 2018;146:156-168.
  192. Deng T, Liang Y, Zhang S, Ren J, Zheng S. A dynamic programming approach to power consumption minimization in gunbarrel natural gas networks with nonidentical compressor units. INFORMS Journal on Computing. 2019;31(3):593-611. doi:10.1287/ijoc.2018.0833 https://doi.org/10.1287/ijoc.2018.0833
  193. Zhang S, Liu S, Deng T, Shen ZJM. Transient-state natural gas transmission in gunbarrel pipeline networks. INFORMS Journal on Computing. 2020;32(3):697-713.
  194. Song, C., Xiao, J., Zu, G., Hao, Z., & Zhang, X. (2021). Security region of natural gas pipeline network system: Concept, method and application. Energy, 217.
  195. Zhou, L., Liao, Z., Wang, J., Jiang, B., Yang, Y., & Du, W. (2015). Energy configuration and operation optimization of refinery fuel gas networks. Applied Energy, 139, 365-375.
  196. Zhao, Y., Xu, X., Qadrdan, M., & Wu, J. (2021). Optimal operation of compressor units in gas networks to provide flexibility to power systems. Applied Energy, 290. https://doi.org/10.1016/j.apenergy.2021.116740 https://doi.org/10.1016/j.apenergy.2021.116740
  197. Rømo F, Tomasgard A, Hellemo L, Fodstad M, Eidesen BH, Pedersen B. Optimizing the Norwegian natural gas production and transport. Interfaces. 2009;39(1):46-56.
  198. Thürauf J. Deciding the feasibility of a booking in the European gas market is coNP-hard. Annals of Operations Research. 2022;318(1):591-618.
  199. Fan, D., Gong, J., Zhang, S., Shi, G., Kang, Q., Xiao, Y., & Wu, C. (2021). A transient composition tracking method for natural gas pipe networks. Energy, 215(PA).
  200. Zhou, D., Jia, X., Ma, S., Shao, T., Huang, D., Hao, J., & Li, T. (2022). Dynamic simulation of natural gas pipeline network based on interpretable machine learning model. Energy, 253.
  201. Wen, K., Lu, Y., Lu, M., Zhang, W., Zhu, M., Qiao, D., Meng, F., Zhang, J., Gong, J., & Hong, B. (2022). Multi-period optimal infrastructure planning of natural gas pipeline network system integrating flowrate allocation. Energy, 257.
  202. Shiono N, Suzuki H. Optimal pipe-sizing problem of tree-shaped gas distribution networks. European Journal of Operational Research. 2016;252(2):550-560.
  203. De Wolf D, Smeers Y. Optimal dimensioning of pipe networks with application to gas transmission networks. Operations Research. 1996;44(4):596-608.
  204. Robinius M, Schewe L, Schmidt M, Stolten D, Thürauf J, Welder L. Robust optimal discrete arc sizing for tree-shaped potential networks. Computational Optimization and Applications. 2019;73(3):791-819.
  205. Zhou, J., Zhao, Y., Fu, T., Zhou, X., & Liang, G. (2022). Dimension optimization for underground natural gas storage pipeline network coupling injection and production conditions. Energy, 256.
  206. Humpola J, Serrano F. Sufficient pruning conditions for MINLP in gas network design. EURO Journal on Computational Optimization. 2017;5(1):239-261.
  207. Rothfarb B, Frank H, Rosenbaum DM, Steiglitz K, Kleitman DJ. Optimal design of offshore natural-gas pipeline systems. Operations Research. 1970;18(6):992-1020.
  208. Yeates C, Schmidt-Hattenberger C, Weinzierl W, Bruhn D. Heuristic methods for minimum-cost pipeline network design - a node valency transfer metaheuristic. Networks and Spatial Economics. 2021;21(4):839-871.
  209. Han, J., Xu, Y., Liu, D., Zhao, Y., Zhao, Z., Zhou, S., Deng, T., Xue, M., Ye, J., & Shen, Z.-J. M. (2019). Operations research enables better planning of natural gas pipelines. Interfaces, 49(1), 23-39.
  210. Massol O. A cost function for the natural gas transmission industry: Further considerations. The Engineering Economist. 2011;56(2):95-122.
  211. Bratakh, M., Soboleva, A., Grebenyuk, S., & Zanochkin, S. (2016). The dependence between production from “mature” gas field and hydraulic resistance of gathering system. Engineering(18), 59-65.
  212. Yu, W., Wen, K., Min, Y., He, L., Huang, W., & Gong, J. (2018). A methodology to quantify the gas supply capacity of natural gas transmission pipeline system using reliability theory. Reliability Engineering & System Safety, 175, 128-141.
  213. Yu, W., Gong, J., Song, S., Huang, W., Li, Y., Zhang, J., Hong, B., Zhang, Y., Wen, K., & Duan, X. (2019). Gas supply reliability analysis of a natural gas pipeline system considering the effects of underground gas storages. Applied Energy, 252.
  214. Yu, W., Huang, W., Wen, Y., Li, Y., Liu, H., Wen, K., Gong, J., & Lu, Y. (2021). An integrated gas supply reliability evaluation method of the large-scale and complex natural gas pipeline network based on demand-side analysis. Reliability Engineering & System Safety, 212.
  215. Chen, Q., Zuo, L., Wu, C., Li, Y., Hua, K., Mehrtash, M., & Cao, Y. (2022). Optimization of compressor standby schemes for gas transmission pipeline systems based on gas delivery reliability. Reliability Engineering & System Safety, 221.
  216. Hong, B., Li, X., Song, S., Chen, S., Zhao, C., & Gong, J. (2020). Optimal planning and modular infrastructure dynamic allocation for shale gas production. Applied Energy, 261. https://doi.org/10.1016/j.apenergy.2019.114439 https://doi.org/10.1016/j.apenergy.2019.114439
  217. Hong, B., Cui, X., Wang, B., Fan, D., Li, X., & Gong, J. (2022). Long-term dynamic allocation and maintenance planning of modular equipment to enhance gas field production flexibility. Energy, 252.
  218. Tan SH, Barton PI. Optimal dynamic allocation of mobile plants to monetize associated or stranded natural gas, part I: Bakken shale play case study. Energy. 2015;93(P2):1581-1594.
  219. Ikonnikova S, Gülen G, Browning J, Tinker SW. Profitability of shale gas drilling: A case study of the Fayetteville shale play. Energy. 2015;81:382-393.
  220. Yuan J, Luo D, Feng L. A review of the technical and economic evaluation techniques for shale gas development. Applied Energy. 2015;148:49-65.
  221. Tan SH, Barton PI. Optimal shale oil and gas investments in the United States. Energy. 2017;141:398-422.
  222. Knudsen BR, Whitson CH, Foss B. Shale-gas scheduling for natural-gas supply in electric power production. Energy. 2014;78:165-182.
  223. Calderón AJ, Guerra OJ, Papageorgiou LG, Reklaitis GV. Disclosing water-energy-economics nexus in shale gas development. Applied Energy. 2018;225:710-731.
  224. Oke D, Mukherjee R, Sengupta D, Majozi T, El-Halwagi MM. On the optimization of water-energy nexus in shale gas network under price uncertainties. Energy. 2020;203. doi:10.1016/j.energy.2020.117770 https://doi.org/10.1016/j.energy.2020.117770
  225. Al-Aboosi FY, El-Halwagi MM. A stochastic optimization approach to the design of shale gas/oil wastewater treatment systems with multiple energy sources under uncertainty. Sustainability. 2019;11(18).
  226. Chebeir J, Geraili A, Romagnoli J. Development of shale gas supply chain network under market uncertainties. Energies. 2017;10(2).
  227. Chaudry, M., Jenkins, N., Qadrdan, M., & Wu, J. (2014). Combined gas and electricity network expansion planning. Applied Energy, 113, 1171-1187.
  228. Qiao Z, Guo Q, Sun H, Pan Z, Liu Y, Xiong W. An interval gas flow analysis in natural gas and electricity coupled networks considering the uncertainty of wind power. Applied Energy. 2017;201:343-353.
  229. Nakashima, P. H. R., & Camponogara, E. (2006). Optimization of lift-gas allocation using dynamic programming. IEEE Transactions on Systems, Man, and Cybernetics, Part A, 36(2), 407-414.
  230. Silva TL, Camponogara E. A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization. European Journal of Operational Research. 2014;232(3):630-642.
  231. Sharma, R., Fjalestad, K., & Glemmestad, B. (2012). Optimization of lift gas allocation in a gas lifted oil field as non-linear optimization problem. Modeling, Identification and Control, 33(1), 13-25. https://doi.org/10.4173/mic.2012.1.2 https://doi.org/10.4173/mic.2012.1.2
  232. Martínez, E. R., Moreno, W. J., Moreno, J. A., & Maggiolo, R. (1994). Application of genetic algorithm on the distribution of gas lift injection. SPE Latin American/Caribbean Petroleum Engineering Conference, Buenos Aires, Argentina (SPE-26993).
  233. Alarcón GA, Torres CF, Gómez LE. Global optimization of gas allocation to a group of wells in artificial lift using nonlinear constrained programming. Journal of Energy Resources Technology. 2002;124(4):262-268.
  234. Buitrago, S., Rodríguez, E., & Espin, D. (1996). Global optimization techniques in gas allocation for continuous flow gas lift systems. SPE Gas Technology Conference, Calgary, Canada (SPE-35616).
  235. Rashid K. Optimal allocation procedure for gas-lift optimization. Industrial & Engineering Chemistry Research. 2010;49:2286-2294. doi:10.1021/ie900867r https://doi.org/10.1021/ie900867r
  236. Nishikiori N, Redner RA, Doty DR, Schmidt Z. An improved method for gas lift allocation optimization. Journal of Energy Resources Technology. 1995;117:87-92.
  237. Kanu EP, Mach J, Brown KE. Economic approach to oil production and gas allocation in continuous gas lift. Journal of Petroleum Technology. 1981;33:1887-1892.
  238. Saepudin D, Soewono E, Sidarto K, Gunawan A, Siregar S, Sukarno P. An investigation on gas lift performance curve in an oil producing well. International Journal of Mathematics and Mathematical Sciences. 2007;2007:1-
  239. doi:10.1155/2007/81519 https://doi.org/10.1155/2007/81519
  240. Souza JNM, Medeiros JL, Costa ALH, Nunes GC. Modeling, simulation and optimization of continuous gas lift systems for deepwater offshore petroleum production. Journal of Petroleum Science and doi:10.1016/j.petrol.2010.03.028 https://doi.org/10.1016/j.petrol.2010.03.028
  241. Camponogara E, Nazari L, Meneses C. A revised model for compressor design and scheduling in gas-lifted oil fields. IISE Transactions. 2012;44(5):342-351.
  242. Milosavljevic P, Marchetti AG, Cortinovis A, Faulwasser T, Mercangöz M, Bonvin D. Real-time optimization of load sharing for gas compressors in the presence of uncertainty. Applied Energy. 2020;272.
  243. Müller ER, Camponogara E, Seman LO, Hülse EO, Vieira BF, Miyatake LK, et al. Short-term steady-state production optimization of offshore oil platforms: Wells with dual completion (gas-lift and ESP) and flow assurance. TOP. 2022;30(1):152-180.
  244. Camponogara E, Oliveira MD, de Aguiar MAS. Scheduling pumpoff operations in onshore oilfields under electric-power constraints. European Journal of Operational Research. 2015;247(3):945-956.
  245. Yu, S., Zhang, S., Agbemabiese, L., & Zhang, F. (2017). Multi-stage goal programming models for production optimization in the middle and later periods of oilfield development. Annals of Operations Research, 255(1), 421-437.
  246. Fang, W. Y., & Lo, K. K. (1996). A generalized well-management scheme for reservoir simulation. SPE Reservoir Engineering, 11(2), 116-120.
  247. Handley-Schachler, S., McKie, C., & Quintero, N. (2000). New mathematical techniques for the optimization of oil and gas production systems. SPE European Petroleum Conference, Paris, France (SPE-65161).
  248. Falcone G, Barbosa JR. State-of-the-art review of liquid loading in gas wells. DGMK/ÖGEW-Frühjahrstagung, Fachbereich Aufsuchung und Gewinnung, Celle, Germany; 2013.
  249. Ştefănescu, D.-P., Maulidani, O., & Audrey, B. (2016). Compressor application for extending production life cycle in mature fields. AGH Drilling, Oil, Gas, 33(2), 495-505. https://doi.org/10.7494/drill.2016.33.2.495 https://doi.org/10.7494/drill.2016.33.2.495
  250. Brown KE, Beggs HD. The technology of artificial lift methods, Volume 1: Inflow performance, multiphase flow in pipes, the flowing well. PennWell Publishing Company, Tulsa, OK; 1977.

How to cite

Licensed under CC BY 4.0.